Our past performance drives our future.

Our Projects

Ample’s team provides its clients with the knowledge and experience to execute contracts with the upmost quality and precision. Please see some of our past performance highlights that showcase our diverse mixture of competencies.

 

PG&E Undergrounding

Lake Berryessa
Electrical Repairs

Theta Xi Fraternity

Fort Cronkhite
Panel Replacements

Mariani Nut Company

Levi's Stadium

Bryte Bend Bridge

801 I Street, Sacramento

El Molino Farms

Blue Oak Park

Capitol Mall

New Komiza Winery

Winters Healthcare

Fort Cronkhite
Panel Replacements

The National Park Service, Golden Gate National Recreation Area, has multiple buildings within its Fort Cronkhite facility requiring panel upgrades. Work included the removal and replacement of various electrical services at 18 buildings.  Replacement equipment consisted of stainless steel panels, conduits, mastheads, and the upgrading of multiple services.
Owner: National Park Service

Theta Xi Fraternity

Provided turn-key electrical services for this ground-up fraternity home located in Davis, CA. Site electrical scope included exterior pole-mounted luminaires, EV charger infrastructure, and monument signage power. We installed a new main switchboard, subpanels, disconnects, conduits, raceways, conductors, boxes, devices, etc. for a complete power distribution system. We installed all building lighting and controls and low voltage scopes.  
Owner: Theta Xi


Lake Berryessa Electrical Repairs

In August 2020, Oak Shores, Smittle, and Capell Day Use Areas sustained extensive damage to its electrical system during the LNU complex fire. The occurred damage varied in scope and rendered critical infrastructure inoperable. Ample Electric, Inc. provided an electrical assessment and identified specific repairs and upgrades required to bring the Berryessa electrical system back online. Work included new 480V panels, step-down transformers, new distribution panels, time clocks, pump control panels, air compressor control panels, lights, and receptacles at 11 restroom locations. Other various repairs included RV pedestal replacement, replacement of damaged circuits, and replacement of fire-damaged S/O cords.
Owner: Bureau of Reclamation.

PG&E Undergrounding

We are proud to play a pivotal role in providing essential civil services to support PG&E’s ambitious 10,000-mile undergrounding project. This significant undertaking aims to enhance the safety and reliability of the energy infrastructure throughout our region, a critical endeavor that benefits all residents. Our company is committed to the success of this project by offering our expertise in heavy civil construction. Our dedicated team is working tirelessly to ensure that the undergrounding process is executed efficiently and with the utmost precision. We believe in the importance of sustainable and resilient energy infrastructure, and by contributing our civil services to PG&E’s initiative, we are actively helping to build a safer and more reliable energy grid that will serve our community for generations to come.

New Komiza Winery

Nestled in the beautiful vineyards of Napa Valley, Ample Electric inc. delivered a start to finish, turn-key electrical services for this ground-up wine processing facility in Sonoma, CA.

We installed the main switchgear, panels, conduits, and feeders. Building power distribution included all conduits, wiring, and devices. We installed the interior and exterior lighting packages and conduits with electrical infrastructure for future EV provisions. The building scope included its power distribution system, lighting and controls package, and low voltage work.



1690 Carneros Meadows Lane

Winters Healthcare

Supporting emergency services, Ample Electric, Inc. self performed site construction for installation of a new sound enclosure, generator, and associated electrical infrastructure. Work included striping and AC upgrades to the facilities parking lot.

172 E Grant Ave, Winters, CA 95694

Capitol Mall

Within this secured and fully occupied facility, Ample Electric Inc. provided electrical and data support services for new modular furniture installation.

650 Capitol Mall, Sacramento, CA 95814

Blue Oak Park

We are proud to support our hometown’s park site lighting and infrastructure upgrade.

312 E Main St, Winters, CA 95694

El Molino

Ample Electric, Inc. completed “ground up” electrical infrastructure installation on this impressive, private, agricultural project.

801 I Street, Sacramento

Known formerly as the U.S. Post Office and the original Federal Courthouse, Ample Electric Inc., removed and upgraded existing site lighting for two historic flagpoles.

801 I St, Sacramento, CA 95814

Bryte Bend Bridge

Within a confined space area, Ample Electric, inc. completed seismic upgrades to existing infrastructure.

West Sacramento, CA 95605

Levi's Stadium

Performed LED lighting upgrade throughout the Levi’s Stadium facilities.

4900 Marie P DeBartolo Way, Santa Clara, CA 95054

Mariani Nut Company

Ample Electric Inc., performs annual, full-time maintenance at many of Mariani Nut’s facilities. Scopes of work include 12kV infrastructure upgrade, forklift chargers, hulling equipment repairs and responding to emergency maintenance requests.